COMPLETE HEATING PLANT + TURBOALTERNATOR, Boiler 25 t/h Turbine (plus altenator) 2,2 Mwh
-
Print this page
- Product ID: VAK11155
- Name: COMPLETE HEATING PLANT + TURBOALTERNATOR, Boiler 25 t/h Turbine (plus altenator) 2,2 Mwh
Boiler SICES start up in 2003, maximum production 25 tons/hour (superheated steam)
Boiler MACCHI start up in 1973, maximum production 16 tons/hour (saturated steam)
Turboalternator system and Turbine Tosi refurbished and powered in 2003, maximum production 2.200 Kwh with 25 tons of superheated steam to 55 bar – 430°C, discharge pressure 4,5 ata.
Aternator SIEMENS refurbished in 2003.
MAIN BOILER SICES of 25 tons/hour with stamp pressure of 20 tons/hour, waterpipes with natural circulation
production to the maximum continuous load: 25.000 kg/hour
– Superheated pressure to the outlet valve: 55 bar
– Stamp pressure: 62 bar g
– Superheated steam temperature: 430° C
– Thermal efficency with production 20 tons/hour: 92,5 %
– testing method for the verification of performance: UNI 7708
– Fuels:
o Liquids:naphtha BTZ (actual version)
o Gas: natural gas
o Solid: Wood dust
The SICES boiler was purchased new and has entered into service in ’August 2003. It’ was stopped in May 2008 and we made a safe treatment for corrosion-free (passivation treatment). The boiler has a maximum production of 25 t / h, but is stamped to 20 t / h and can be conducted with Italian license B.
The TOSI turbine has been completely overhauled and upgraded in 2003. The boiler is designed to be powered by BTZ naphtha (present condition) but can be converted to natural gas and also wood dust.
All the thermal power station is new and has been completely rebuilt (Electrical systems and control systems included) between 2001 and 2003